Miami-Dade cities · Coral Gables
The Drawings Have to Name the Color of the Glass
Coral Gables reviews architecture city-wide, not only in historic areas, and its window submittal is the most demanding of any city on this site.
Give us the address and tell us whether it is a condo or a historic district. Those two answers change the job more than the window does.
NOA
The approval that governs your window is issued by this county
HVHZ
Miami-Dade is one of only two counties in the zone
Our crews
We measure, we schedule, and our own people install
Licensed
A licensed Florida general contractor
Two approvals most owners have never heard of
The Board of Architects is the part that surprises people. It was created, in the city's words, "to ensure that the city's architecture is consistent with the city's regulations and to preserve the traditional aesthetic character of the community"; it applies published Design Review Standards covering compatibility of color, materials, fenestration and proportion; and it reviews before the permit is issued. The important word is where. Not only in historic areas — the Board appears as a required approval on the ordinary window and door permit, listed alongside Building, Historical if applicable, Structural if commercial and Public Works if commercial.
The second surprise is the submittal itself, set out on page 14 of the Development Services permit requirements. Drawings must include a site plan, and the document says outright that "a Survey cannot serve as the Site Plan"; floor plans; a roof plan where skylights are involved; exterior elevations at 1/8 inch to the foot and details at 3/4 inch to the foot. They must "Provide Quantity of Doors/Skylights/Windows, Color of Frames and Glass and/or Mullions." Product approval drawings "must be an exact duplication of the Original Approval", carrying fasteners, mullions, glazing, span capacities and mounting details. Photographs of existing conditions have to be in color; the document states "NO black & white photos Allowed".
Then the item that separates this city from its neighbors. Coral Gables requires "site specific Wind Load Calculations with Digital Signatures by an Architect or Engineer for the openings where the Doors/Skylights/Windows are to be installed". There is no single-family exemption. Hialeah asks for per-opening pressures on multifamily and commercial only; North Miami ties its pressure item to buildings of two stories or more. In the Gables, a one-story house swapping four windows falls under the same sentence as a tower.
What a Gables package contains
- Board of Architects approval, obtained ahead of the permit rather than alongside it.
- Sealed site-specific wind load calculations with digital signatures, for the openings being replaced.
- Drawings naming the quantity, and the color of frames, glass and mullions.
- Product approval drawings reproduced exactly as the original approval, fasteners and span capacities included.
- Color photographs of existing conditions in PDF, since black and white will not be accepted.
- An HOA or condominium letter of authorization where one applies to the address.
A 1920s core inside a high-velocity hurricane zone
Coral Gables was incorporated on 29 April 1925, and the city puts the build-out plainly: "Much of Coral Gables was built at a meteoric speed between 1921 and 1926." A large share of the housing the Board of Architects is protecting predates the code regime it now sits inside by seventy years. On the element in question the city's preservation guide is direct — "windows are of critical importance in defining the period's character and should be maintained" — which is why an appearance conversation here is not decoration, it is the review.
The ownership pattern follows the housing, and the city's own paperwork shows it. The Board of Architects checklist asks for a homeowners association approval from named private communities — Gables Estates, CocoPlum, Tahiti Beach, Snapper Creek, Deering Bay, Journey's End — which is the paperwork of a city of owner-occupied houses inside gates, not of a rental market. The person deciding is usually the person living there. That makes the conversation shorter than a condominium's and the appearance question larger than anywhere else on this list.
How we sequence a Gables job
- 01Settle color and profile first, because both have to appear on the drawings and both have to survive the Board.
- 02Have the wind load calculations prepared and signed for the actual openings rather than for a typical one.
- 03Assemble the drawing set at the stated scales and reproduce the product approval exactly.
- 04Submit for Board of Architects review with the calendar in hand, then file for the permit.
- 05Carry the job through window and door bucks, anchors and final, and through final historical where that applies.
The Board's calendar is the first thing we plan around. It meets every Thursday at 8:30 AM at 427 Biltmore Way, submissions are due by 12 PM on the Friday before, and a project costing over $75,000 must be publicly noticed at least five business days ahead of the meeting. None of that is difficult. All of it is a date, and a specialty unit ordered before the date is a unit ordered on a guess. We would rather lose two weeks at the front of a job than a quarter in the middle of one.
Sources: City of Coral Gables Development Services permit requirements (4 April 2025 revision), page 14; the city's Board of Architects page; the city's history and historic preservation pages — checked 2026-09-24
Said plainly
Where we stop
We are the contractor, not your architect of record. The wind load calculations carry an architect's or engineer's signature, and where the Board conditions a profile, a proportion or a finish, the person who should answer is a designer who appears in front of that Board regularly. We will say so rather than resubmitting and hoping. One more limit, and it is a common one here: several private communities in the city — Gables Estates, Gables Estates 2, CocoPlum 2, Isles of CocoPlum, Tahiti Beach, Snapper Creek, Deering Bay and Journey's End — require their homeowners association's approval with the application. We cannot obtain that on your behalf, and a job waiting on it is waiting on a neighbor's meeting, not on us.
FAQ
Common questions
- Does the Board of Architects only review historic homes?
- No. It appears as a required approval on the ordinary window and door permit, city-wide. Historical review is a separate item on the same list that applies where the property calls for it.
- Do I need an engineer for four windows on a one-story house?
- The city asks for site-specific wind load calculations with digital signatures by an architect or engineer for the openings being replaced, with no single-family exemption. Budget for it at the start, not later.
- Why must the drawing name the color of the glass?
- Because the permit requirements say so: quantity, and the color of frames, glass and mullions. It is also what the Board is reviewing, so leaving it blank stalls the design review and the permit together.
- How much time does Board review add?
- It is a calendar rather than a queue. The Board meets Thursdays at 8:30 AM, submissions are due by 12 PM the Friday before, and work over $75,000 needs five business days of public notice.
What we install
Impact Windows
The core product, and in this county the one you can actually verify. Every unit should arrive with a Notice of Acceptance number you can look up yourself.
Read more →
Sliding Glass Doors
In Miami the widest opening is usually a balcony slider, on an elevation facing open water, high above grade. It carries the highest load on the unit and the most demanding installation detail.
Read more →
Entry Doors
A small opening carrying a large expectation — and in a historic district, the single element most likely to be conditioned by a review board.
Read more →
Garage Doors
On a single-family Miami house the garage door is the largest opening in the envelope and the one whose failure does the most damage. It is also the one most often left out of a window upgrade.
Read more →
French & Specialty Openings
Arched heads, French pairs, fixed picture units, corner glazing. On Mediterranean Revival and Art Deco elevations these are not decoration — they are the building, and they are where approval and appearance argue hardest.
Read more →
Impact Glass Retrofit
Replacing the glazing and keeping the existing frames. On the right building it saves real money and real disruption, and on a condo it can sidestep an association appearance argument entirely.
Read more →
What is different about Miami-Dade
The NOA Is Issued Here
The Notice of Acceptance that governs your window is issued by Miami-Dade County Product Control. It is public, numbered and searchable — which makes a quote here checkable in a way it is nowhere else in Florida.
Read more →
Historic Districts
Several Miami-Dade municipalities review exterior changes before a permit is issued. In a historic district the design question is settled before the code question, and the order matters.
Read more →
Condos & Associations
In a high-rise the window is usually a limited common element. The association controls specification, colour and often the contractor, and a unit owner who orders unilaterally can be made to take the work out.
Read more →
Other cities we cover
Miami
In Miami's designated historic districts a window swap is Certificate of Appropriateness work first. That review sits in front of the building permit.
Read more →
Miami Beach
In a designated Miami Beach historic district the design guidelines send you to the Building Department for microfilm of the building's original windows.
Read more →
Hialeah
Hialeah's window and door sheet asks for per-opening wind pressures on multifamily and commercial work only. That is a filing rule, not a physics one.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.
