Miami-Dade cities · Miami
Two Approvals in Miami, and One of Them Is Not a Permit
In Miami's designated historic districts a window swap is Certificate of Appropriateness work first. That review sits in front of the building permit.
Give us the address and tell us whether it is a condo or a historic district. Those two answers change the job more than the window does.
NOA
The approval that governs your window is issued by this county
HVHZ
Miami-Dade is one of only two counties in the zone
Our crews
We measure, we schedule, and our own people install
Licensed
A licensed Florida general contractor
Two reviews, and only one of them shows up on a quote
The City of Miami runs its own building department and takes window and door applications through iBuild, with drawings uploaded to ProjectDox. That part is ordinary. What catches owners out is the second review sitting beside it. The city's Historic Preservation Division names window replacement as work needing a Certificate of Appropriateness, in language that leaves nothing to argue about: "This can include small projects like window replacements as well as large projects like new construction." Then it adds the sentence that fixes the order of the whole job: "A COA is not a Building permit, and is only part of the permitting process."
Where that bites is in the paperwork. The COA submittal list asks for "Detailed Drawings Showing Existing and Proposed Dimensions (for windows & door replacement)" and a "Window and Door Schedule Specifying all Openings to be Replaced". A single price for the house cannot become that schedule. Somebody has to write out every opening, with the dimension that is there now and the dimension proposed, before the preservation side will look at it. If the contractor measured three windows and multiplied, that work has not been done and the owner is the one who finds out.
The districts are not obscure corners of the city either. Miami's own pages name Morningside, MiMo/BiBo, Buena Vista East, Palm Grove, Spring Garden, Coconut Grove West, Lummus Park, Bayside, Riverview, Beverly Terrace, South River Drive and the Wynwood NRD-1 among them. Plenty of houses nobody would describe as historic sit inside one, and the rule follows the address rather than the architecture.
What the Miami route asks of you
- Whether the address falls inside one of the city's locally designated districts, established before anything is ordered.
- A Certificate of Appropriateness where it applies, obtained as its own step rather than folded into the permit.
- Existing and proposed dimensions drawn for every window and door, not for a representative sample.
- A written schedule listing all openings to be replaced, which doubles as the document that makes a quote legible.
- Product approval for each opening, filed with the building application through iBuild.
- A decision about whether any opening changes size, because that closes the fast homeowner route.
The wind figure, and the question that comes before it
The city's residential windows and doors checklist tells an applicant what site parameters the pressures are to be worked out against. Its words, exactly: "Site wind pressures. ASCE 7-22 Chapter 30 and the 2023 FBC, Building sections 1620.2 and 1620.3 (175 mph (3-second gust)/ Exposure C)." That is an instruction about a calculation. It is not a rating you can shop for, and a salesperson who turns it into "your windows must be rated for 175 mph" has changed the meaning into something else entirely.
The question that comes before it is who signs. In a city with this much condominium and rental stock, the person living behind the glass is frequently not the person who decides, and both the Certificate of Appropriateness and the building permit need the party who does. Settling that first — association, landlord, or you — saves more time on a Miami job than any other single step, because every document downstream of it is addressed to whoever that turns out to be.
How we sequence a Miami job
- 01Check the address against the city's designated districts before a product is selected.
- 02Measure every opening and write down both the existing and the proposed dimension.
- 03Build the window and door schedule the preservation submittal asks for, and reuse the same document for the building application.
- 04Leave the openings as they are unless there is a reason to change them.
- 05File through iBuild and ProjectDox, then meet the buck and final inspections on site.
We write the schedule once and use it twice, because the preservation office and the building office are asking for the same information in two places. On the shortcut and its limit the city's residential exterior windows and doors checklist is blunt: work "Shall be existing frame or existing rough opening, changes to the openings are not allowed for Homeowner's Express Reviews, they will need to be part of a remodeling permit." Wanting a wider opening for a view is reasonable. It is also the decision that converts a window permit into a remodeling permit, and it should be made knowingly rather than discovered at intake.
Sources: City of Miami residential permit exterior windows and doors applicant checklist, and the city's Repair or Renovate a Historic Property page — checked 2026-09-24
Said plainly
Where we stop
We do not prepare or argue Certificate of Appropriateness applications at a board hearing. Where a district officer conditions a profile or a finish, the right person to answer is an architect who works in that district, and we will say so rather than resubmitting hopefully. There is a second thing we cannot give you: Miami's historic preservation design guidelines are not published online, and the city directs you to a public records request for them. So we will not tell you what Miami requires on frame color or muntin pattern in a district. We do not know, and we are not going to invent it.
FAQ
Common questions
- Is my house in a Miami historic district?
- Check the address with the city's Historic Preservation Division before you shop. Miami's designated districts include Morningside, MiMo/BiBo, Buena Vista East and Spring Garden among others, and plenty of ordinary-looking houses sit inside one.
- Does a COA replace the building permit?
- No. The city states plainly that a COA "is not a Building permit, and is only part of the permitting process." You need both, and the preservation approval sits in front of the other one.
- Can I enlarge an opening while the wall is open?
- You can, but it moves the permit. The city's checklist says changes to openings are not allowed on the Homeowner's Express Review route and must be part of a remodeling permit. Decide before ordering.
- What inspections should I expect?
- The checklist names two on a window and door permit: Window/Door Buck and Window/Door Final. The buck inspection happens before the finish goes back on, which is why the sequence matters to your dates.
What we install
Impact Windows
The core product, and in this county the one you can actually verify. Every unit should arrive with a Notice of Acceptance number you can look up yourself.
Read more →
Sliding Glass Doors
In Miami the widest opening is usually a balcony slider, on an elevation facing open water, high above grade. It carries the highest load on the unit and the most demanding installation detail.
Read more →
Entry Doors
A small opening carrying a large expectation — and in a historic district, the single element most likely to be conditioned by a review board.
Read more →
Garage Doors
On a single-family Miami house the garage door is the largest opening in the envelope and the one whose failure does the most damage. It is also the one most often left out of a window upgrade.
Read more →
French & Specialty Openings
Arched heads, French pairs, fixed picture units, corner glazing. On Mediterranean Revival and Art Deco elevations these are not decoration — they are the building, and they are where approval and appearance argue hardest.
Read more →
Impact Glass Retrofit
Replacing the glazing and keeping the existing frames. On the right building it saves real money and real disruption, and on a condo it can sidestep an association appearance argument entirely.
Read more →
What is different about Miami-Dade
The NOA Is Issued Here
The Notice of Acceptance that governs your window is issued by Miami-Dade County Product Control. It is public, numbered and searchable — which makes a quote here checkable in a way it is nowhere else in Florida.
Read more →
Historic Districts
Several Miami-Dade municipalities review exterior changes before a permit is issued. In a historic district the design question is settled before the code question, and the order matters.
Read more →
Condos & Associations
In a high-rise the window is usually a limited common element. The association controls specification, colour and often the contractor, and a unit owner who orders unilaterally can be made to take the work out.
Read more →
Other cities we cover
Miami Beach
In a designated Miami Beach historic district the design guidelines send you to the Building Department for microfilm of the building's original windows.
Read more →
Hialeah
Hialeah's window and door sheet asks for per-opening wind pressures on multifamily and commercial work only. That is a filing rule, not a physics one.
Read more →
Coral Gables
Coral Gables reviews architecture city-wide, not only in historic areas, and its window submittal is the most demanding of any city on this site.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.