Miami-Dade cities · North Miami
The 25% Line That Decides Whether You Also Buy Shutters
North Miami attaches shutters to a partial replacement once more than 25% of a building's openings are being replaced on a house or duplex.
Give us the address and tell us whether it is a condo or a historic district. Those two answers change the job more than the window does.
NOA
The approval that governs your window is issued by this county
HVHZ
Miami-Dade is one of only two counties in the zone
Our crews
We measure, we schedule, and our own people install
Licensed
A licensed Florida general contractor
Doing half the house is a different permit here
Phasing a window job is normal. You do the front elevation this year and the back next year, because that is what the money allows. North Miami has written a rule that changes the arithmetic on that plan, and it is the sharpest numeric line on any window checklist we read in the county. The city's Window/Door/Shutter Permit Submittal Requirement Checklist says: "Shutters are required if more than 25% of the openings of the building are being replaced on a single family or duplex residence; and you must provide Product Approval for the shutters. Impact resistance is required on all commercial retrofits regardless of size or amount."
Read that against a phased plan. A house with sixteen openings replacing five sits under the line. Replacing six crosses it, and the submittal then carries shutters and shutter product approvals as well. We are not going to tell you how the department applies that where the new units are themselves impact rated, because the checklist does not say and we have not seen it written anywhere we could quote. What we will do is ask, in writing, before a unit is ordered, and hand you the answer with the source attached rather than an opinion with a logo on it.
The wind pressure item is written differently here too. The checklist asks: "For each opening shown, indicate the calculated negative and positive wind pressures in accordance with ASCE-7-22 (required for 2 stories or more)." So the filing threshold in North Miami is height, where Hialeah's is building type and Coral Gables has none at all. Three neighboring cities, three different answers to the same question, on a job that is otherwise identical from the street.
What North Miami wants in the package
- Two copies of the Product Control Notice of Acceptance for each window, door, shutter and mullion.
- Calculated negative and positive wind pressures for each opening, required at two stories or more.
- Shutters and their product approval where more than 25% of the openings on a single family or duplex residence are being replaced.
- Impact resistance on all commercial retrofits, which the checklist applies regardless of size or amount.
- Condominium association board approval, which the checklist makes the permit holder's job to obtain before work starts.
- Miami-Dade Fire approval on commercial and multifamily work.
Why partial replacement is so common here
Phasing is the normal way a window job gets done on an older house, and it has nothing to do with indecision. An owner replaces the elevation that leaks, or the bedrooms, or the openings a storm already found, and comes back for the rest when there is money again. Every city on this list sees that. North Miami is the only one that has attached a consequence to it, and the consequence lands on the sixth window rather than the first.
Which is the whole reason to count before the deposit rather than at the second permit. The line is not a penalty and it is not hidden — it is in the city's own checklist, one sentence long, and it can be read in less time than it takes to choose a frame color. What it cannot do is announce itself once the units are ordered.
The mechanics of filing are straightforward by comparison. The Building Department sits at 12340 NE 8th Avenue and its portal is reached through the city's online permits address, handling application, payment, digital plan upload and contractor registration in one place. Two copies of each Notice of Acceptance sounds like a small clerical detail until a package comes back for the missing duplicate, which is why we assemble the submittal against the checklist line by line instead of from memory.
How we price a phased job
- 01Count the openings on the building and establish which side of the 25% line the intended scope falls on.
- 02Price the shutter item where it applies, in the same number as the windows rather than as a later surprise.
- 03Work out the pressures per opening and show them where the two-story threshold applies.
- 04Get the association's written approval in hand before we start, because the checklist puts that on the permit holder.
- 05File through the city's E-Services portal and carry the job to final.
We count first. It takes twenty minutes on site and it decides whether the job you are imagining is the job you are buying. Where an owner wants to phase the work, we lay out both versions — the scope that stays under the line, and the scope that crosses it with the shutter item priced in — and you choose with the two numbers side by side. Deciding that in February is cheap. Deciding it after the units are on order is the expensive version of the same conversation. Where the count lands close to the line, both scopes go on one sheet with the shutter approvals listed separately, so nobody has to remember afterwards which version was quoted.
Sources: City of North Miami Window/Door/Shutter Permit Submittal Requirement Checklist, with the city's Building Department page — checked 2026-09-24
Said plainly
Where we stop
We do not interpret the shutter rule on the city's behalf. The wording is theirs, we quote it as written, and how the department applies it at a particular address is the department's call; asking before ordering is the only sensible move. We also cannot obtain condominium board approval for you. The checklist puts that squarely on the permit holder, before work begins, and a board that has not been asked is the most common reason a job that was ready to start does not start. And we will not carry a shutter line nobody has priced: if shutters enter the scope they arrive with their own product approval and their own installation detail, both shown beside the openings they cover.
FAQ
Common questions
- What is the 25% rule?
- The city's checklist states that shutters are required if more than 25% of the openings of the building are being replaced on a single family or duplex residence, and that product approval for the shutters must be provided.
- Can I stay under it by doing fewer windows?
- Counting the openings tells you where the line falls. Whether that is the right plan is a separate question, since a partial job leaves the rest of the envelope as it was. We will price both.
- Do I need wind pressure calculations?
- The checklist asks for calculated negative and positive pressures for each opening in accordance with ASCE-7-22, required for two stories or more. A single-story house does not carry that filing item.
- I am in a condo here. What comes first?
- Board approval. The checklist makes the permit holder responsible for obtaining condominium association board approval before work starts, and Fire approval applies on commercial and multifamily work.
What we install
Impact Windows
The core product, and in this county the one you can actually verify. Every unit should arrive with a Notice of Acceptance number you can look up yourself.
Read more →
Sliding Glass Doors
In Miami the widest opening is usually a balcony slider, on an elevation facing open water, high above grade. It carries the highest load on the unit and the most demanding installation detail.
Read more →
Entry Doors
A small opening carrying a large expectation — and in a historic district, the single element most likely to be conditioned by a review board.
Read more →
Garage Doors
On a single-family Miami house the garage door is the largest opening in the envelope and the one whose failure does the most damage. It is also the one most often left out of a window upgrade.
Read more →
French & Specialty Openings
Arched heads, French pairs, fixed picture units, corner glazing. On Mediterranean Revival and Art Deco elevations these are not decoration — they are the building, and they are where approval and appearance argue hardest.
Read more →
Impact Glass Retrofit
Replacing the glazing and keeping the existing frames. On the right building it saves real money and real disruption, and on a condo it can sidestep an association appearance argument entirely.
Read more →
What is different about Miami-Dade
The NOA Is Issued Here
The Notice of Acceptance that governs your window is issued by Miami-Dade County Product Control. It is public, numbered and searchable — which makes a quote here checkable in a way it is nowhere else in Florida.
Read more →
Historic Districts
Several Miami-Dade municipalities review exterior changes before a permit is issued. In a historic district the design question is settled before the code question, and the order matters.
Read more →
Condos & Associations
In a high-rise the window is usually a limited common element. The association controls specification, colour and often the contractor, and a unit owner who orders unilaterally can be made to take the work out.
Read more →
Other cities we cover
Miami
In Miami's designated historic districts a window swap is Certificate of Appropriateness work first. That review sits in front of the building permit.
Read more →
Miami Beach
In a designated Miami Beach historic district the design guidelines send you to the Building Department for microfilm of the building's original windows.
Read more →
Hialeah
Hialeah's window and door sheet asks for per-opening wind pressures on multifamily and commercial work only. That is a filing rule, not a physics one.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.
